N-Channel JFET Switch
J111 – J113 / SST111 – SST113

APPLICATIONS
Analog Switches
Choppers
Commutators
ABSOLUTE MAXIMUM RATINGS
(TA = 25oC unless otherwise specified)
Gate-Drain or Gate-Source Voltage . . . . . . . . . . . . . . . . -35V
Gate Current . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50mA
Storage Temperature Range . . . . . . . . . . . . . -55oC to +150oC
Operating Temperature Range . . . . . . . . . . . -55oC to +135oC
Lead Temperature (Soldering, 10sec) . . . . . . . . . . . . . +300oC
Power Dissipation . . . . . . . . . . . . . . . . . . . . . . . . . . . 360mW
Derate above 25oC . . . . . . . . . . . . . . . . . . . . . . 3.3mW/oC
NOTE: Stresses above those listed under “Absolute Maximum
Ratings” may cause permanent damage to the device. These are
stress ratings only and functional operation of the device at these or
any other conditions above those indicated in the operational sections
of the specifications is not implied. Exposure to absolute maximum
rating conditions for extended periods may affect device reliability.
ORDERING INFORMATION
Part Package Temperature Range
J111-113 Plastic TO-92 -55oC to +135oC
SST111-113 Plastic SOT-23 -55oC to +135oC
For Sorted Chips in Carriers see 2N4391 series.
For more information and complete design information,pls send us an email to info@kruse.de
or visit our shop.